International Alliance for Interoperability - IAI
Data Exchange Standards Activity
Data Exchange Standards Activity
| Planning | |
| Programming | Yes. 70% covered*. Building commissioning is implicitly covered by having a model, but the process itself is not. (* covered means that IFC model has the capability to store the required information). |
| Pre-Project Planning |
Yes. 60% covered -- connecting enterprise operational needs with facilities, defining functional requirements, public input, feasibility studies. Not covered -- A/E, CM selection and procurement, funding.
|
| Contracts | Yes. Project participant and contact info covered. Contracts can be referenced, but content not defined in IFC. |
| Design | |
| Design Project Management | Yes. 80% covered in IFC Product Model Servers. |
| Design | Yes. 95% covered. |
| Analysis | Yes. 90% of data to perform analysis covered by IFC model. |
| Code Compliance | Yes 85% covered. |
| LEED Compliance | Yes. 60%. Energy and ASHRAE are well covered. Material contents, some site work and drainage are moderately covered. Ecology modestly covered. |
| Documentation | Yes. 90% The IFC model can store the info to generate views. Specification clauses and referencing to external specs are covered. |
| Preconstruction | |
| Cost Estimating | Yes. Detailed cost estimating 85% covered. |
| Scheduling | Yes. 85% Scheduling logic and 4-D covered, scenario planning depends on application. |
| Bidding and Buyout | Products that are fully specified in the IFC-BIM can be directly purchased from automatically generated buyout lists -the software to do this has not been done. |
| Construction | |
| Procurement | Yes. 80% Matching requirements with available products on-line is well covered. However, products must be available on-line in compatible format. |
| Fabrication/Shop Drawings | Not beyond normal CAD, 3-D capabilities. Rely on API exchange with CIS/2 being developed for Steel. |
| Construction Management | No. AGC is sponsoring a project for this purpose under aecXML. |
| Tenant Improvements | |
| Furniture Fixtures and Equipment | Yes. 95% All products covered to the degree info is available. |
| Telecommunications | Yes, telecommunication and other networks are covered. 80%. |
| Closeout | |
| Commissioning | Will be enabled by current PAMPeR project and follow-up FM Domain project. |
| Post Occupancy Evaluation | Will be enabled by current PAMPeR project. |
| Ongoing Operations | |
| Asset Management | Examples: Time Series (Time related events); Asset management (identification, histories, inventories); Condition Monitoring (Captures condition data including both measured (by Instrumentation) and assessed (by visual inspection); Space and Move management; Request Capture (Captures ad hoc requests made for operating and maintenance work and allocation of requests to work orders.); Service Life Data (Inclusion of capabilities for service life capture and management including reference and expected service life and ISO based service life factors); Environmental impact (Capture of environmental impact data for objects allowing impact assessment to be carried out in support of sustainable working); Operating and Maintenance information (Provision of capability to capture operating and maintenance instruction information based on the US Navy/Dept of Health developed OMSI XML standards). |
| Maintenance | FM domain project starting with OSCRE to transfer directly appropriate design & construction information to CAMMs. |